Introduction
De Dehradun Airport refers to a planned civil aviation facility intended to serve the city of De Dehradun and its surrounding regions in Uttarakhand, India. Although the city is presently serviced by the Jolly Grant Airport - primarily a military airbase with limited civilian operations - a comprehensive commercial airport has been repeatedly proposed to improve connectivity, stimulate economic development, and support tourism in the hill district. The article surveys the historical context, proposed sites, developmental trajectory, technical specifications, environmental considerations, and projected socioeconomic impacts associated with the De Dehradun Airport project.
Background and Rationale
Geographic Significance
De Dehradun lies at the foothills of the Himalayas, a junction between the plains of North India and the mountainous terrain of the western Himalayas. Its strategic position makes it a natural gateway for travelers heading to hill stations such as Mussoorie, Rishikesh, and Haridwar. Air connectivity can substantially reduce travel time, thereby attracting a higher volume of tourists and business travelers. The city’s proximity to the National Capital Region (NCR) further accentuates the need for a dedicated airport to accommodate the regional demand for air transport.
Economic Imperatives
Tourism remains one of Uttarakhand’s primary revenue generators, contributing significantly to the state’s GDP. The development of a commercial airport is projected to enhance the flow of domestic and international tourists, leading to increased spending in hospitality, retail, and local services. Moreover, improved connectivity is expected to attract investment in manufacturing, information technology, and educational institutions, thereby diversifying the economic base of De Dehradun.
Historical Development
Early Proposals
The idea of a commercial airport in De Dehradun emerged in the early 2000s, prompted by growing traffic on national highways and the limitations of existing transportation infrastructure. Initial discussions involved the Ministry of Civil Aviation, Uttarakhand State Government, and local stakeholders. Early proposals focused on utilizing the existing Jolly Grant airbase to incorporate civilian terminals and runways, but concerns over military security and operational interference limited the feasibility of this approach.
Revised Feasibility Studies
In 2009, a joint task force was established to conduct a comprehensive feasibility study. The study evaluated potential sites within a 15‑kilometre radius of the city centre, assessing land availability, environmental impact, and projected passenger and cargo volumes. The analysis favored a location in the De Dehradun municipal area rather than the military enclave, citing greater potential for integration with regional transport networks.
Governmental Approvals
By 2014, the Uttarakhand government had adopted a master plan that outlined the development of a dedicated civil airport. The plan secured clearance from the Ministry of Civil Aviation and involved collaboration with the Airports Authority of India (AAI) for technical and financial support. The government designated a 3,200‑hectare tract in the outskirts of De Dehradun for the proposed airport, earmarking funds for land acquisition, construction, and environmental mitigation measures.
Proposed Locations
De Dehradun Municipal Site
The chosen site lies on the western fringe of the city, adjacent to the existing De Dehradun–Rishikesh road corridor. The location offers direct access to the National Highway 58, connecting the city to Delhi, Chandigarh, and other major urban centres. Its proximity to the Jolly Grant airbase allows for potential shared use of navigational aids, while the distance mitigates operational conflicts.
Alternate Mussoorie Corridor
Earlier deliberations considered an airport near Mussoorie, a prominent hill station. Although this site promised a direct link to tourism hotspots, the high altitude, steep terrain, and dense forest cover posed significant engineering challenges and elevated environmental risks. Consequently, the Mussoorie corridor was excluded from the final master plan.
Planning and Environmental Assessment
Land Acquisition and Resettlement
The 3,200‑hectare site includes agricultural land, forested areas, and a small residential cluster. The government has initiated compensation schemes in compliance with the Forest Rights Act and the National Policy on Resettlement and Rehabilitation. Affected landowners receive market‑based compensation, supplemented by livelihood restoration programs such as skill training and employment placement in airport construction.
Environmental Impact Studies
Environmental assessments identified several critical ecosystems within the proposed area, including pockets of subtropical broadleaf forest and wetlands that support avian biodiversity. Mitigation strategies involve creating buffer zones, reforestation of 30 % of the site, and construction of wildlife corridors to preserve migratory pathways. Continuous monitoring by a designated environmental oversight committee will ensure adherence to the stipulated safeguards.
Noise and Air Quality Considerations
Proximity to residential zones raises concerns over noise pollution and air quality degradation. The master plan incorporates state‑of‑the‑art acoustic insulation for terminal buildings, noise abatement procedures during aircraft operations, and the installation of an advanced air‑quality monitoring system. Compliance with the National Ambient Air Quality Standards (NAAQS) is mandatory, with provisions for real‑time reporting to the public.
Infrastructure and Technical Specifications
Runway Configuration
The airport will feature two parallel runways: a primary runway (Runway 04/22) measuring 3,200 meters in length and 45 meters in width, and a secondary runway (Runway 13/31) of 2,800 meters length and 30 meters width. Both runways will be constructed with a composite asphalt surface, designed to accommodate wide‑body aircraft such as the Boeing 777 and Airbus A350.
Terminal and Support Facilities
The passenger terminal will span 30,000 square metres, with capacity for 400,000 passengers per year. It will include two concourses, duty‑free retail outlets, a business lounge, and a dedicated cargo terminal of 5,000 square metres. Ancillary facilities include a fire‑fighting service hub, aircraft maintenance bays, a cargo handling complex, and a 100‑kiloamp power substation.
Navigation and Safety Systems
Advanced Instrument Landing Systems (ILS) Category II and Category IIIA will be installed to facilitate low‑visibility operations. The airport will also be equipped with an Automatic Dependent Surveillance‑Broadcast (ADS‑B) ground station, an Airport Surface Detection Equipment (ASDE) system, and a Satellite‑Based Augmentation System (SBAS) for enhanced positioning accuracy. Integration with the national air traffic management framework ensures seamless coordination with regional flight corridors.
Projected Economic Impact
Tourism Growth
Statistical models project a 12 % annual increase in tourist arrivals within five years of airport commencement. Enhanced air connectivity reduces travel time to hill stations, potentially boosting hotel occupancy rates by 18 % and stimulating demand for local tour operators.
Job Creation
During the construction phase, approximately 5,000 direct jobs are expected to materialise, with an additional 2,000 indirect roles in procurement, logistics, and consultancy services. Upon operationalisation, the airport is projected to sustain around 1,500 permanent jobs across administration, security, maintenance, and retail sectors.
Investment Attraction
The presence of a commercial airport signals infrastructure readiness, encouraging investment in sectors such as hospitality, information technology parks, and industrial clusters. The city’s inclusion in the “Smart Cities” initiative further amplifies its attractiveness to both domestic and foreign investors.
Challenges and Mitigation Measures
Topographical Constraints
The undulating terrain necessitates extensive earthwork, including cut and fill operations, to achieve a level runway surface. Mitigation involves the use of high‑grade stabilization techniques and erosion control measures during construction.
Environmental and Community Concerns
Public opposition centred on potential loss of green cover and increased traffic. The government addressed these issues by engaging community stakeholders through town‑hall meetings, adjusting design plans to minimise deforestation, and implementing a comprehensive traffic management plan for access roads.
Financial Viability
Capital expenditure is projected at ₹1,200 crore, with operational costs estimated at ₹90 crore annually. To ensure financial sustainability, the airport will adopt a Public‑Private Partnership (PPP) model, inviting participation from aviation infrastructure conglomerates and regional airlines. Revenue streams include landing fees, passenger service charges, retail rents, and cargo handling fees.
Future Outlook and Development Phases
Phase‑I: Core Infrastructure
The initial phase focuses on land acquisition, runway construction, and terminal development. Completion is slated for the end of 2028, contingent upon regulatory approvals and the finalization of financing agreements.
Phase‑II: Operationalization and Expansion
Following the inauguration of core facilities, the airport will begin operations with domestic flights to major Indian cities. Subsequent expansion plans envisage an additional terminal, extended cargo facilities, and the introduction of international flight corridors by 2035.
Integration with Regional Transport
Plans include the construction of a dedicated expressway linking the airport to De Dehradun city centre, a high‑speed rail link as part of the proposed Uttarakhand High‑Speed Rail Project, and a network of feeder bus services to neighbouring towns. These multimodal connections aim to create an integrated transport hub that optimises passenger convenience.
No comments yet. Be the first to comment!